Transport & logistics
Warehouse management, fleet telematics and the integrations between them. Cutovers get scheduled around the freight calendar, not ours.
We are not a specialist in any single industry and we do not claim to be. What our clients share is that their systems carry operational load — when something stops, somebody downstream notices within the hour.
8 sectors shown
Warehouse management, fleet telematics and the integrations between them. Cutovers get scheduled around the freight calendar, not ours.
Operational technology sitting alongside corporate IT, with a segregation story that has to satisfy an auditor as well as an engineer.
Asset bases that grew faster than the systems tracking them. Usually a data problem wearing an infrastructure costume.
Clinical and administrative systems where the controlling risk is a privacy breach, not an outage.
Independent assessment and third-party due diligence for firms whose own regulator asks the questions first.
Document management, matter systems and a confidentiality posture that has to hold up under privilege.
Point of sale, stock and store connectivity, where the busiest trading days are the ones you cannot schedule work on.
Student and staff identity, device fleets and the seasonality of an enrolment cycle that will not move for a project plan.
Including what went wrong in them. A case study with no setbacks in it is marketing, and everybody reading it knows that.
Warehouse management upgrade and Azure migration. Eleven distribution sites, one of them running a version four releases behind. We slipped the third site by two weeks because a stock-take clashed with the cutover window and we would not run both — flagged it eleven days out. Now on a Silver retainer.
OT and corporate network segregation. A regulator finding gave a nine-month deadline. The hard part was not the firewalls; it was establishing which of 340 devices were actually load-bearing, half of which were not in any register. Discovery ran two weeks longer than scoped, absorbed at our cost because the estimate was ours to get right.
Essential Eight maturity assessment. Scored lower than the internal self-assessment on four of the eight mitigations, which was not a welcome conversation. We did not bid on the remediation programme — it went to market and another firm won it. We re-scored twelve months later.
Asset data consolidation. Sold as an integration build; discovery found the real problem was three systems disagreeing about what an asset was. We rewrote the proposal downward — a fixed-price data-modelling piece first — which cost us roughly a third of the original engagement value and made the rest of it deliverable.
The list is where we have done the work, not where we are willing to. What matters more than the industry is whether the systems carry operational load and whether somebody internally owns the outcome.